ALL exhibitors who order water & drainage supply must submit the Water & Drainage Safety Contract” based on COEX regulations. The installation would be limited if it is not submitted within the deadline.

※ ※ Failure to submit this form may result in delays or restrictions on the on-site installation of water & drainage supply.

👥 Mandatory to: Exhibitors applying for water & drainage supply (Not applicable to exhibitors who did not apply)

✍️ How to Apply : CafeShow Online Exhibitor Portal → Mandatory Application → Water & Drainage Supply Safety Contract → Fill out & Submit → Submit signed/stamped contract via official email

⏰ Deadline : ~September 30th (Wed), 2026

Group 55.png

Contract form example

Contract form example

<aside> 🚨

Important Guideline for Water & Drainage Supply

  1. Operating Hours
  1. Water Leakage Prevention

Water leakage inside the exhibition hall may cause electrical hazards and flooding.

  1. Drainage Line Installation

The use of T-joints (T-line drainage connections) is strictly prohibited. Each drainage pipe must be connected directly to its corresponding equipment on a one-to-one basis.

  1. Additional Protective Devices

If there is any risk of equipment damage due to pressure fluctuations, pressure reduction, or pressure loss, appropriate protective devices must be installed at the exhibitor's own expense.

  1. Important Notes for Uninstallation
  1. Lobby Booths Water & drainage supply and compressed air cannot be installed in lobby booths due to the structural limitations of the COEX lobby area. </aside>